Tolldish Hall Farm Solar – High Voltage Substation Delivery

Providing fully engineered, site-ready power infrastructure for utility-scale solar developments.

Screenshot 2026-01-29 at 13.01.53.png

Project Overview

B&S Group successfully delivered a High Voltage (HV) substation for the Tolldish Hall Farm Solar project, supporting the development of a renewable energy asset capable of generating up to 25 MW of clean electricity once operational.

Delivered for Ormazabal, specialists in customised and high-tech electrical solutions, the project demonstrates B&S Group’s capability in providing fully engineered, site-ready power infrastructure for utility-scale solar developments.

Client:
Ormazabal – Specialists in customised and high-tech electrical solutions

Sector:

Renewable Energy

Solar PV

Capability:

High Voltage Substations

Modular Power Infrastructure

Renewable Grid Connections

The Challenge

Utility-scale solar projects require robust, compliant HV infrastructure that can be delivered to tight programme constraints while meeting exacting quality and safety standards. The Tolldish Hall Farm Solar project demanded a substation solution capable of integrating advanced HV switchgear, while ensuring reliability, efficiency, and seamless installation on site.

B&S Group Solution

B&S Group was appointed to deliver a fully engineered HV substation enclosure, designed and fabricated in-house to meet project-specific technical and environmental requirements.

The scope of works included:

  • Full design and fabrication of the HV substation enclosure

  • Auxiliary electrical installation and full fit-out

  • Integration of free-issued HV switchgear, supplied and commissioned by Ormazabal

  • Delivery, offloading, and placement on site, ensuring readiness for final commissioning

By managing design, fabrication, and integration under one delivery model, B&S Group ensured quality control, reduced installation risk, and supported efficient project execution.

Outcome

Once operational, the Tolldish Hall Farm Solar site will generate up to 25 MW of renewable electricity — enough to power approximately 7,000 homes. The delivered substation provides a reliable and high-performance grid interface, supporting long-term operational stability and compliance.

This project further reinforces B&S Group’s role in enabling the UK’s renewable energy transition through the delivery of engineered power infrastructure built for performance, safety, and longevity.

Check out the rest of our projects

News

Why Choose B&S Group

We work as a trusted engineering partner, delivering power infrastructure that supports the UK’s transition to a resilient, low-carbon energy future.

Over 30 years of engineering expertise

In-house fabrication and integrated delivery

Proven experience in regulated and safety-critical environments

A focus on quality, compliance, and long-term performance