top of page

MoD facility

A site central to national defence operations.

PHOTO-2025-11-20-08-19-55.jpg

News

Why Choose B&S Group

We work as a trusted engineering partner, delivering power infrastructure that supports the UK’s transition to a resilient, low-carbon energy future.

Over 30 years of engineering expertise

In-house fabrication and integrated delivery

Proven experience in regulated and safety-critical environments

A focus on quality, compliance, and long-term performance

Project Overview

B&S Group delivered a custom-engineered 11kV substation enclosure for a Training Facility at a site central to national defence operations.

 

The project was delivered in partnership with Schneider Electric.

Client:

Schneider Electric

UK Ministry of Defence

Sector:

Critical National Infrastructure

Defence

Capability:

11kV Substations
Secure Modular Enclosures
High-Integrity Power Systems

Outcome

The solution enabled efficient installation and handover, delivering reliable power infrastructure to support essential MoD operations at one of the UK’s most secure naval facilities.

The Challenge

Defence infrastructure requires highly secure, resilient, and precisely engineered power solutions capable of supporting mission-critical operations in tightly controlled environments.

The project required:

  • A secure, prefabricated substation solution

  • Exact equipment integration

  • Rigorous quality and testing standards

Check out the rest of our projects

B&S Group Solution

B&S Group designed and manufactured a 14.7m x 4.2m three-room prefabricated 11kV substation, purpose-built for defence applications. 
 

Key features included: 
 

  • Factory-built construction for controlled quality assurance 

  • Precise equipment fit-out and integration 

  • Factory acceptance testing prior to delivery 

PHOTO-2025-11-20-08-19-54.jpg
bottom of page