Marksbury Plain Solar Farm – Primary & Secondary Substations
A major renewable energy development near Bath for European Energy

The Challenge
As a multi-phase renewable development, the project required:
-
A coordinated substation strategy across primary and secondary assets
-
High-quality enclosures delivered ready for rapid connection and testing
-
Minimal programme risk to maintain momentum across construction phases
-
Infrastructure designed for long-term operational performance
All works needed to align with European Energy’s sustainability goals and strict grid compliance requirements.
Outcome
All substations were successfully delivered and installed in line with programme requirements, supporting a solar farm that will:
-
Generate up to 15MW of renewable electricity
-
Power approximately 4,700 homes with clean, home-grown energy
-
Operate for up to 40 years
-
Prevent an estimated 304,000 tonnes of CO₂ emissions, equivalent to removing 176,000 cars from UK roads
The project also contributes to local environmental enhancement through biodiversity-focused land use proposals.
Why Choose B&S Group
We work as a trusted engineering partner, delivering power infrastructure that supports the UK’s transition to a resilient, low-carbon energy future.
Over 30 years of engineering expertise
In-house fabrication and integrated delivery
Proven experience in regulated and safety-critical environments
A focus on quality, compliance, and long-term performance
Project Overview
B&S Group was appointed to deliver Phase 1 and Phase 2 substation infrastructure for the Marksbury Plain Solar Farm, a major renewable energy development near Bath for European Energy.
The project forms part of the UK’s growing solar generation capacity, delivering long-term clean energy while enhancing local biodiversity and environmental outcomes.
B&S Group Solution
B&S Group provided a comprehensive scope of works, including:
-
Design and installation of 1 x Primary Switchgear Enclosure
-
Design and installation of 4 x Secondary Transformer Substations
-
In-house fabrication to ensure quality, consistency, and programme certainty
-
Delivery of all five enclosures fully completed and ready for connection
By managing the entire process internally, B&S Group ensured tight control over quality, timelines, and risk throughout both project phases.

Client:
European Energy
Sector:
Energy Generation
Solar PV
Capability:
Primary & Secondary Substations
Turnkey Renewable Infrastructure





