Lister Drive Greener Grid Park – Grid Stability Infrastructure

A pioneering grid stabilisation project.

Screenshot 2026-01-30 at 12.55.55.png

B&S Group Solution

B&S Group was appointed to support the project through design, manufacture, and installation, delivering:

​

  • Two bespoke E-Houses, designed and manufactured by B&S Group

  • Full fit-out to house ABB variable speed drives and supporting systems

  • A balance-of-plant enclosure containing MV switchgear and control systems, supplied for the main contractor NRS

  • Factory-based assembly, fit-out, and testing at B&S Group’s Chester facility

​

By delivering fully integrated, site-ready units, B&S Group reduced on-site risk and supported efficient installation.

Outcome

The Lister Drive Greener Grid Park now provides essential grid stability through a 67 MVAr synchronous condenser, coupled with a 40-tonne flywheel, delivering the inertia required to maintain network frequency and voltage.

​

The site enables increased integration of renewable energy sources such as wind and solar, while supporting grid resilience without reliance on fossil fuels — a key milestone in the UK’s decarbonisation journey.

Check out the rest of our projects

News

Why Choose B&S Group

We work as a trusted engineering partner, delivering power infrastructure that supports the UK’s transition to a resilient, low-carbon energy future.

Over 30 years of engineering expertise

In-house fabrication and integrated delivery

Proven experience in regulated and safety-critical environments

A focus on quality, compliance, and long-term performance

Project Overview

B&S Group partnered with long-standing client ABB to deliver critical infrastructure for the Lister Drive Greener Grid Park in Liverpool — a pioneering grid stabilisation project developed by Statkraft, Europe’s largest generator of renewable energy.

Delivered as part of a £25 million investment, the project plays a pivotal role in supporting the UK’s transition away from fossil-fuelled power generation and towards a resilient, renewable-led electricity network.

Clients / Partners:

ABB

Statkraft

NRS

Sector:

Power Transmission & Storage
Grid Stability

Capability:

E-Houses
MV Switchgear Enclosures 
Grid Stabilisation Infrastructure

The Challenge

As renewable energy generation increases, maintaining grid stability without traditional rotating power stations presents a major technical challenge.

​

The Lister Drive Greener Grid Park required infrastructure capable of:

  • Replicating the inertia traditionally provided by fossil fuel power plants

  • Supporting network frequency and voltage stability

  • Housing advanced power electronics and control systems

  • Delivering a highly engineered solution within a compact, urban environment

​

The project demanded close collaboration between technology providers, engineers, and infrastructure specialists.