Project Overview
B&S Group supported the UK’s first operational green hydrogen network through delivery of critical electrical infrastructure for the H100 Green Hydrogen Project in Fife, working as supply chain partners to Schneider Electric.
Client:
Schneider Electric
Sector:
Energy Transmission & Storage
Hydrogen
Capability:
Power Quality Systems
Containerised Substations
Advanced Cooling Integration
Outcome
The solution delivers stable, compliant electrical performance within a pioneering hydrogen production environment, demonstrating B&S Group’s capability across emerging energy technologies.
The Challenge
Hydrogen production environments demand highly stable power quality, resilient cooling systems, and robust infrastructure capable of supporting sensitive processes.
The project required:
-
Advanced power quality management
-
Redundant cooling systems
-
Compact, maintainable infrastructure
B&S Group Solution
B&S Group designed and manufactured a two-room containerised power quality substation, including:
-
Raised 1.5m substructure with access gantry and stairway
-
One room housing 2 Schneider Electric Prisma LV panels
-
Second room containing 10 x 300A active harmonic filters
-
78kW cooling capacity with N+1 redundancy