top of page

Cumberhead West & Hagshaw Hill Wind Farms

Together, the sites form part of a major renewable energy cluster contributing significantly to Scotland’s onshore wind capacity.

Screenshot 2026-01-30 at 12.52.35.png

Check out the rest of our projects

News

Why Choose B&S Group

We work as a trusted engineering partner, delivering power infrastructure that supports the UK’s transition to a resilient, low-carbon energy future.

Over 30 years of engineering expertise

In-house fabrication and integrated delivery

Proven experience in regulated and safety-critical environments

A focus on quality, compliance, and long-term performance

Project Overview

B&S Group delivered medium-voltage electrical infrastructure supporting the re-energisation of Cumberhead West Wind Farm and Hagshaw Hill Wind Farm in South Lanarkshire, Scotland, under the SPR Frameworks programme.

Together, the sites form part of a major renewable energy cluster contributing significantly to Scotland’s onshore wind capacity.

Client:

SPR Frameworks
Schneider Electric

Sector:

Energy Generation
Onshore Wind

Capability:

33kV Turbine Substations
MV Infrastructure
Renewable Energy Networks

Outcome

  • Cumberhead West: 20 turbines delivering approximately 126MW

  • Hagshaw Hill: 14 modern turbines delivering approximately 79MW

The projects significantly increase renewable output while consolidating legacy infrastructure, supporting Scotland’s transition to low-carbon energy.

The Challenge

Utility-scale wind farms require robust MV infrastructure capable of operating reliably in demanding environmental conditions while enabling efficient power collection and transfer to the wider network.
 

The projects required:

  • High-reliability turbine substations

  • Standardised yet bespoke MV solutions

  • Proven compatibility with Schneider Electric switchgear

B&S Group Solution

B&S Group engineered, supplied, and delivered 34 wind turbine substations, each designed to house Schneider Electric DVCAS 33kV switchgear.

Scope of delivery included:

  • 20 turbine substations for Cumberhead West

  • 14 turbine substations for Hagshaw Hill

  • Integration of DVCAS 33kV switchgear and RCPs

  • Designs optimised for long-term durability and safe operation

bottom of page