Coylton Greener Energy Park – BESS Substation Delivery

A critical part of Statkraft’s Greener Grid Parks programme.

Screenshot 2026-01-30 at 12.52.35.png

Client:
Powersystems

Programme:

Statkraft Greener Grid Parks

Sector:

Power Transmission & Storage
Battery Energy Storage Systems (BESS)

Capability:

HV & LV Substations
Modular Power Infrastructure
Off-Site Fabrication & Delivery

The Challenge

Grid-scale BESS projects require highly integrated power infrastructure that can be delivered efficiently while meeting strict performance, safety, and programme requirements.

For the Coylton site, the challenge was to design, build, and deliver large-scale HV and LV substations that were fully assembled, tested, and ready for rapid installation — minimising on-site activity and ensuring seamless integration within a constrained energy park environment.

B&S Group Solution

B&S Group was appointed to design, manufacture, and deliver two fully completed substations, each engineered and assembled at our Chester facility before transportation to site.

The scope of works included:

  • Design, fabrication, and full fit-out of one HV and one LV substation

  • Factory build and commissioning within a controlled environment

  • Delivery of two large-scale units (each 14.7m x 3.9m)

  • Complex logistics planning and transportation, including police escort

  • Safe offloading and placement at the Coylton Greener Energy Park site

 

This off-site build approach ensured consistent quality, reduced programme risk, and supported efficient site installation.

Outcome

The substations now form a vital component of Statkraft’s Greener Grid Parks, enabling smart energy management and supporting increased integration of renewable generation into the UK electricity network.

By delivering fully completed, site-ready infrastructure, B&S Group helped accelerate deployment while maintaining the highest standards of safety, reliability, and performance.

This project directly supports the UK’s ambition to deliver a cleaner, greener, and more resilient energy system, reinforcing B&S Group’s role as a trusted partner in advanced energy storage and grid infrastructure.

Check out the rest of our projects

News

Why Choose B&S Group

We work as a trusted engineering partner, delivering power infrastructure that supports the UK’s transition to a resilient, low-carbon energy future.

Over 30 years of engineering expertise

In-house fabrication and integrated delivery

Proven experience in regulated and safety-critical environments

A focus on quality, compliance, and long-term performance

Project Overview

B&S Group successfully delivered two fully completed substations — one High Voltage (HV) and one Low Voltage (LV) — for the Coylton Greener Energy Park Battery Energy Storage System (BESS) in Ayr, Scotland.

Delivered for Powersystems, the project forms a critical part of Statkraft’s Greener Grid Parks programme, which uses smart, compact infrastructure to enable increased renewable energy flow through the national grid.

bottom of page