The Challenge

Grid-scale BESS projects require highly integrated power infrastructure that can be delivered efficiently while meeting strict performance, safety, and programme requirements.

​

For the Coylton site, the challenge was to design, build, and deliver large-scale HV and LV substations that were fully assembled, tested, and ready for rapid installation — minimising on-site activity and ensuring seamless integration within a constrained energy park environment.

B&S Group Solution

B&S Group was appointed to design, manufacture, and deliver two fully completed substations, each engineered and assembled at our Chester facility before transportation to site.

​

The scope of works included:

  • Design, fabrication, and full fit-out of one HV and one LV substation

  • Factory build and commissioning within a controlled environment

  • Delivery of two large-scale units (each 14.7m x 3.9m)

  • Complex logistics planning and transportation, including police escort

  • Safe offloading and placement at the Coylton Greener Energy Park site

 

This off-site build approach ensured consistent quality, reduced programme risk, and supported efficient site installation.

Outcome

The substations now form a vital component of Statkraft’s Greener Grid Parks, enabling smart energy management and supporting increased integration of renewable generation into the UK electricity network.

​

By delivering fully completed, site-ready infrastructure, B&S Group helped accelerate deployment while maintaining the highest standards of safety, reliability, and performance.

​

This project directly supports the UK’s ambition to deliver a cleaner, greener, and more resilient energy system, reinforcing B&S Group’s role as a trusted partner in advanced energy storage and grid infrastructure.

Check out the rest of our projects

News

Why Choose B&S Group

We work as a trusted engineering partner, delivering power infrastructure that supports the UK’s transition to a resilient, low-carbon energy future.

Over 30 years of engineering expertise

In-house fabrication and integrated delivery

Proven experience in regulated and safety-critical environments

A focus on quality, compliance, and long-term performance

Project Overview

B&S Group successfully delivered two fully completed substations — one High Voltage (HV) and one Low Voltage (LV) — for the Coylton Greener Energy Park Battery Energy Storage System (BESS) in Ayr, Scotland.

Delivered for Powersystems, the project forms a critical part of Statkraft’s Greener Grid Parks programme, which uses smart, compact infrastructure to enable increased renewable energy flow through the national grid.